Project Status

670 Apartment Project was started on 26/11/2017 and will be made ready for occupation by the end of 2019.

Project Overview

Raki group having offered affordable Housing to many in Rajamahendravaram successfully has once again started similar Township Housing project with 670 flats in 2BHK and 3BHK in Gannavaram near Vijayawada, Krishna district of Andhra Pradesh state. The construction of these flats in Chandrika Ayodhyaa has already started and is progressing with God-Speed. The project is unique in that it offers Housing to many at very affordable prices, especially at a time when Housing has become a big and imperative need to all those working in the upcoming IT ventures located between Vijayawada Airport and Gannavaram town.

NEAR BY PROXIMITIES

  • 2 km
    Airport
  • 2 km
    Medha Towers
  • 2 km
    St.John's School
  • 1.5 km
    Main Market
  • 1.5 km
    Highway
  • 8 km
    Usha rama
    engineering
    College
  • 1 km
    Gannavarm
    Railway
    station
  • 5 km
    Delhi
    Public
    School
  • 4 km
    Sidhartha
    Medical
    college
  • 2 km
    NTR
    Veterinary
    College
  • 300m
    Temple
  • 5 km
    DJR
    Engineering
    college
  • 2 km
    Bus
    Complex
  • 1 km
    Narayana
    School

SPECIFICATIONS

FOUNDATION & STRUCTURE

Heavy Reinforced Cement Concrete framed structure M – 25 grade concrete and Fe 500 grade TMT Steel, as per the structural design.

SUPERSTRUCTURE

External walls of 9’’ thick and internal walls 4 ½’’ thick of red bricks.

PLASTERING

Sponge Finish for external and internal walls with cement mortar 1:6.

DOORS

Best Quality Flush Doors.

WINDOWS

Built With UPVC with safety grills.

GRILLS

Designed Mild Steel (MS) Grills With Enamel paint Finish.

BATHROOMS

EWC with Flush Tank of the best brand. Provision for Geyser in all bathrooms. All C.P fittings are chrome plated of the best brand.Glazed ceramic tiles dado of the best brand upto 4'0" height.

FLOORING

Quality Vitrified Tiles. Living /Dining/Bedrooms and other rooms with 600X600 mm size with 4’’ inch skirting of best brand. Anti-skid ceramic tiles for bathrooms and balconies. Granite stone for stair case.

ELECTRICAL

Concealed 3- Phase Wiring With ISI marked superior quality PVC insulated copper cables, Modular switches, Adequate light points, fan points, Independent Energy Meter for each apartment.

CUPBOARDS

Built with cement for all bedrooms.

EXTERNAL HAND RAILINGS

Stainless steel for stair case and MS railing for balconies.

KITCHEN

Kitchen counter with Ceramic tiles dado upto 2'0" height above kitchen platforms. Ample storage space. Granite platform with stainless steel sink.

TELECOM

Telephone points in living area.

CABLETV

Provision for cable connection in living room.

PARKING

Cement based designer tiles flooring in the parking area. Car parking will be allotted on lottery basis for all FLat'owners.

BACK-UP GENERATOR

24 hours back up provision. (Except AC and Geyser).

LIFT

Lift will be provided of superior range.

SECURITY

CCTV Security Systems with DVR recording facility at the security kiosk.

Amenities

Club House
Yoga Room
Conference Hall
Swimming Pool
Indoor Games
Gym

STATUS OF THE APARTMENTS

CLICK ON THE ICON TO KNOW THE STATUS

AADHYA
Block A
Basement PCC
In Progress

AARYA
Block B
Column Casting
In Progress

ABHINAYA
Block C
Earth Back Filling
In Progress

AISHWARYA
Block D
Basement PCC
In Progress

AKSHAYA
Block E
Stilt Floor Slab Shuttering
In Progress

ALAKANANDA
Block F
Flirst Floor Slab Casting
Completed

AGRAGANYA
Block J
Column Casting
In Progress

AMBHUJA
Block I
Column Casting
In Progress

ANANTH
Block H
Second Floor Column Casting
In Progress

ANURUP
Block G
First Floor Column Casting
In Progress

ARUNODAYA
Block K
Basement PCC
In Progress

ABHAYA
Block L
First Floor Column Casting
In Progress

ANNAPURNA
Block M
First Floor Column Casting
In Progress

APARNA
Block N
First Floor Column Casting
In Progress

ARUNDATHI
Block O
First Floor Slab Casting
In Progress

AARTHI
Block P
Stilt Floor ReinForcement
In Progress

AKSHARA
Block Q
First Floor Slab Casting
Completed